EasyManua.ls Logo

Festo MPS 2000 - Project Overview

Festo MPS 2000
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Introduction
6 © Festo Didactic GmbH & Co. • MPS
The following table give you an overview about all projects within this
documentation in the structure of:
Commissioning:
Analysis (Analyse a system) and
Commissioning (Installation&Commissioning)
Programming:
Programming (Programming single Station and
Project (Communication with other Stations)
Trouble Shooting:
Program (Programming Errors) and
Process
*
(Trouble Shooting in the Process)
The table also mention the time which is necessary to work out the respective
project. This time is based on experience with participants coming with no
knowledge about the MPS-Stations and less knowledge about programming a
Simatic PLC with STEP 7.
*
Regarding the Process-Trouble Shooting, there is no big difference in time between
the single troubles-based on experience we can say, that each trouble needs around
1,5 hour including the preparation and test of the error by the instructor and if the
participants follow the three steps carefully and doing the documentation, which is
very important.
This structure allows you to put your specific workshop together according to your
needs and your learning targets.
Project overview

Related product manuals