4. Starting up
4.1 Commissioning
Checkthattheinstallationandassemblyactionsarecomplete(e.g.,powersupplyavailable,functioningoractivatedfuses,
equipmentisfreefromleaks,stablesetupoftheunit).
Oncethecapvalve(tobeprovidedbythecustomer)ontheunithasbeenopenedandtheaccumulatorhasbeenlledwithfeed
medium, Flamco-Fill P is ready for operation.
4.2 Conguration
Initial conguration was completed at the factory (for original equipment), or – for retrotting – customer service congures
the Flamco-Fill P lling unit on the SPC!
WithintheSPCsubmenuitems[8-2]thecustomer/ownercanadjusttheswitchinglimitsforlling,asrequired.See:Basicinstallation
document and Flamcomat or Flexcon MK Installation and operating instructions.
Filling monitoring is automatically carried out by the SPC.
4.3 Recommissioning
Recommissioning(e.g.,afterextendedperiodsofinactivity/shutdownandmaintenance)assumesthatthesystemisfreefromleaks
and electrically correctly connected.
5. Maintenance
Any dirt traps which the customer may have installed must be cleaned at least every six months.
A leakage test and a function check of all components must be performed at least once a year.
Shouldavisualcheckofthesystemnecessitateother/furthermaintenance,thismayonlybeperformedbyqualiedpersonnel.