EasyManua.ls Logo

Fluke 183 - Operating Basics; Safe Test Lead Connections

Fluke 183
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
True RMS Digital Multimeters
Operating Basics
11
Operating Basics
Before you take any of the measurements described in this section, follow
these steps:
For specified accuracy, allow the meter to stabilize for 30 seconds after
you turn on the meter.
Observe the safe test lead connections below when you remove the test
leads from the meter.
Always disconnect power to the circuit when you measure resistors,
capacitors, diodes, or continuity within the circuit.
Discharge capacitors before taking capacitance measurements.
Safe Test Lead Connections
To safely disconnect the test leads from the meter, first disconnect all test leads
from the circuit being tested, then disconnect the leads from the input
connectors.
WWarning
To prevent electrical shock, do not insert unnecessary test
leads or metal pins into the A (amps) connector. Voltages
applied to any connector may be present at all other input
connectors. Only use the test leads supplied or
recommended (or their equivalent) with the meter. Refer to
the "Accessories" section.

Table of Contents

Related product manuals