EasyManua.ls Logo

Fronius Symo GEN24 6.0.Plus - Page 4

Fronius Symo GEN24 6.0.Plus
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Internal schematic connection diagram of the IOs 31
Backup power variant - PV Point (OP) 33
General 35
PV Point (OP) 35
Explanation - PV Point (OP) 35
Backup power variant - Full Backup 37
General 39
Prerequisites for backup power mode 39
Transitioning from feeding energy into the grid to backup power mode 39
Transitioning from backup power mode to feeding energy into the grid 39
Backup power and energy saving mode 39
Cabling variants including emergency power circuits and 3-pin separation e.g. Austria or Australia 41
Functions 41
Transitioning from feeding energy into the grid to backup power mode 41
Transitioning from backup power mode to feeding energy into the grid 41
All-pin separation cabling variant, e.g. Germany, France 42
Functions 42
Transitioning from feeding energy into the grid to backup power mode 42
Transitioning from backup power mode to feeding energy into the grid 43
All-pin split separation cabling variant (Italy) 44
Functions 44
Transitioning from feeding energy into the grid to backup power mode 44
Transitioning from backup power mode to feeding energy into the grid 45
Installation 47
General 49
Quick-lock system 49
Warning notices on the device 49
Installation location and position 51
Choosing the location of the inverter 51
Choosing the location of third-party batteries 52
Explanation of symbols for the installation position 52
Install the mounting bracket and hang up the inverter 54
Selecting the fixing material 54
Properties of the mounting bracket 54
Do not deform the mounting bracket 54
Fitting the mounting bracket to a wall 54
Installing the mounting bracket on a mast or beam 55
Attaching the mounting bracket to mounting rails 55
Attaching the inverter to the mounting bracket 56
Prerequisites for connecting the inverter 57
Permitted cables 57
Permitted cables for the data communication area 57
Cross section of the AC cable 58
Cross section of the DC cable 59
Maximum alternating current fuse protection 59
Connecting the inverter to the public grid (AC side) 60
Safety 60
Connecting the inverter to the public grid (AC side) 60
Connecting solar module strings to the inverter 63
General comments regarding solar modules 63
Safety 63
PV generator - general information 64
PV generator configuration6 - 10 kW 64
Connecting the solar module strings to the inverter 65
Connecting the battery to the inverter 69
Safety 69
Connecting the battery on the DC side 69
Connecting backup power - PV Point (OP) 73
4

Table of Contents

Related product manuals