EasyManua.ls Logo

Fuji Electric FVR-C11S-7EN Series - Page 31

Fuji Electric FVR-C11S-7EN Series
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Installation and Connection 2-17
FVR-C11S-EN
2
1) Use this connection to start, stop the opera-
tion and set the frequenc
y
with external si
g
-
nals. 0 to 10V DC can be set while function
F01 is set to 1 and +4 to +20mA DC can be
set while function F01 is set to 2. Set function
F02 to 1.
2) Set SW7 at P24.
3) Remove the jumper between the P1 and P(+)
terminals before connectin
g
the optional pow-
er-factor correctin
g
DC reactor.
4) Connect the sur
g
e absorber in parallel to coils
(such as coils of the ma
g
netic contactor and
solenoid) near the inverter.
5) Use twisted or shielded wire as control si
g
nal
wire. Connect the shield to the
g
round termi-
nal.

Table of Contents

Related product manuals