3-1 3 Operation
FVR-C11S-EN
3
3 Operation
Table 3-2-1 General operation method
3-1 Inspection
and Prepara-
tion before
Operation
Check the followin
before operation:
1) Check whether the connection is correct.
For sin
le-phase 200V series, check whether the power suppl
is
connected correctl
to the L1/L and L2/N terminals. Also check
whether the inverter
roundin
terminal G is securel
connected.
2) Check for short-circuits and
round faults between terminals and be-
tween live parts.
3) Check for loose terminals, connectors, and screws.
4) Check whether the motor is separated from mechanical equipment.
5) Set switches to OFF before turnin
on the power so that the inverter
will not start or operate abnormall
at power-on.
6) Check the followin
after power-on:
a) Check for alarms displa
ed on the ke
pad panel.
1. Alwa
s install the surface cover before turnin
on the power.
Do not remove the surface cover durin
conduction.
Otherwise electric shock could occur.
2. Do not operate a switch with wet hands.
Otherwise electric shock could occur.
3-2 Operation
Method
There are various operation methods. Select a method dependin
on
the purpose and operation specifications with reference to Chapters 4
and 5. Table 3-2-1 lists operation methods used
enerall
.
Operation method Frequenc
settin
Runnin
command
Operation b
usin
ke
pad
panel
Built-in frequenc
settin
POT (VR) or UP/DOWN
ke
RUN/STOP ke
Operation b
usin
external
si
nal terminal
Settin
b
usin
analo
volta
e, analo
current,
and external POT (VR)
Contact input (switch)
z
When SW7 is set at CM
Connect external power suppl
and connect
terminal FWD with the (+) terminal of the
external power suppl
,
or connect terminal REV with the (+)
terminal of the external power suppl
.
z
When SW7 is set at P24
Connect terminal FWD with P24/CM or
connect terminal REV with P24/CM.
Refer to section 2-3-3.
WARNING