8-1 8 Maintenance and Inspection
8
8 Maintenance
and Inspection
Execute the dail
inspection and periodic in-
spection for preventin
a fault and ensurin
lon
-term reliabilit
.
Note the followin
re
ardin
the work.
8-1 Dail
Inspection
Durin
the operation and conduction, the visual
inspection for abnormal operation is executed
from the outside without removin
the covers.
Inspections are usuall
done to check the follow-
in
:
1. The expected performance (satisf
in
the
standard specification) is obtained.
2. The environment satisfies the standard spec-
ification.
3. The ke
pad panel displa
is normal.
4. There are no abnormal sound, vibrations or
unpleasant odors.
5. There are no overheatin
marks or discolora-
tion.
8-2 Periodic Inspection
The periodic inspection must be executed after
stoppin
the operation and cuttin
off the power
source and removin
the surface cover.
After power-off, time is needed for the smoothin
capacitors in the DC section in the main circuit to
dischar
e. To prevent electric shock, make sure
that the volta
e falls down to the safet
value
(25VDC and below) usin
a multimeter after the
char
e lamp (CRG)
oes off.
WARNING
1. Start inspection five minutes or more after
turnin
off the power suppl
. (Check that
the char
e lamp (CRG)
oes off, and
check the volta
e is 25V DC or below be-
tween terminals P(+) and N(-).
There is dan
er of electric shock.
2. Onl
the desi
nated person can perform
the maintenance and replace components.
(Take off an
metal objects such as a
watch or rin
.)
(Use insulated tools.)
3. Never modif
the inverter.
There is dan
er of electric shock or in-
ur
.