Installing the hardware Installing/removing the rack model
V CAUTION!
Ensure that the safety lock has been inserted before the server is
inserted!
Ê Repeat the above steps for the right-hand support system (with the front and
rear right support uprights).
Ê Fit the PRIMECENTER/DataCenter rack cable management as described in
the technical manual for the corresponding rack.
Ê Fit the cage nuts for securing the server in the corresponding catches on the
right and left support uprights.
Ê Insert the server (see section “Installation in PRIMECENTER/DataCenter
rack” on page 50).