Q-12 Series 90™-30 PLC LONWORKS® Bus Interface Module User's Manual
June 1997 GFK-1322A
Q
6
.
When you have finished configuring the reference map, press E
SC
to return to the Rack
Configuration view, which will now contain the Foreign Module. (If you want to return to the
detail screen shown in step 4, press F10 — zoom).
7. To save the configuration and return to the Configuration Software menu, press E
SC
.
Summary
After the LBIM configuration, network installation, and PLC configuration have been completed,
you are ready to check the configuration. To do this, power cycle the PLC. When the PLC powers
up, you should observe the following sequence of events:
The PWR indicator on the LBIM lights and remains on.
LBIM performs a self-test, during which IN MSG and OUT MSG indicators will light briefly.
When powerup is complete the SVC indicator should
not
be flashing. (The SVC indicator
flashes when the LBIM is in an unconfigured state.)
If the IN MSG and OUT MSG indicators flash alternately, perform the following procedure:
1
.
Check for overlaps in the network variable mapping and correct the mapping if
necessary.
2
.
Download the LBIM configuration again.
3
.
Power cycle the module.

Table of Contents

Other manuals for GE 90*-30 PLC Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE 90*-30 PLC Series and is the answer not in the manual?

GE 90*-30 PLC Series Specifications

General IconGeneral
BrandGE
Model90*-30 PLC Series
CategoryComputer Hardware
LanguageEnglish

Related product manuals