EasyManua.ls Logo

GE AKTA ready XL - Page 102

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step Action
8 Fit the pump chamber to the pump motor and the pressure plate to the
p
ump head.
Make sure the pump head is oriented so that the clamp ring screw (F) loca-
ted at the back is aligned with the hole for the screw cap.
Note:
Fit the isocratic pump chamber to the pump motor P-201.A and the pres-
sure plate to the pump head.
Fit the gradient pump chamber to the pump motor P-201.B and the pres-
sure plate to the pump head.
F
9 Attach the pump chamber and the pressure plate with the four hex screws
l
oosely. Then tightening them crosswise to a torque of 25 Nm using the
tool and the 8 mm attachment head illustrated below.
Note:
D
o not use manual force to compress the pump chamber. The pump cham-
ber is decompressed using the hex screws.
10 Remove the attachment head from the torque tool.
5 Preparation
5
.2 Install disposable flow kits
102
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals