EasyManua.ls Logo

GE AKTA ready XL - Page 115

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Position and install the outlet
m
anifold
Step Action
1 Locate the outlet manifold.
2 Position the outlet manifold on the corresponding outlet valves on the
r
ight side of the system.
3 Open the valves and insert the tubing into the valves, then close the valves.
5 Preparation
5
.2 Install disposable flow kits
ÄKTA ready XL Operating Instructions 29281616 AE 115
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals