Step Action
3 Lock all large pinch valves on the system by setting each locking pin to the
l
ocked position.
Note:
Locking the pinch valves is done to prevent the valves from actuating and
closing while installation is occurring.
Install the pump chamber
F
ollow the instructions below and fit one pump chamber at a time.
5 Preparation
5
.2 Install disposable flow kits
ÄKTA ready XL Operating Instructions 29281616 AE 99
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***