EasyManua.ls Logo

GE AKTA ready XL - Page 99

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step Action
3 Lock all large pinch valves on the system by setting each locking pin to the
l
ocked position.
Note:
Locking the pinch valves is done to prevent the valves from actuating and
closing while installation is occurring.
Install the pump chamber
F
ollow the instructions below and fit one pump chamber at a time.
5 Preparation
5
.2 Install disposable flow kits
ÄKTA ready XL Operating Instructions 29281616 AE 99
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals