General System Requirements 1.3 Delivery Requirements
1.3.4 Crated and Uncrated Weights, Measurements and Clearance
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare 1-15
Table 1-4: D670 Additional CT-specific Components and Clearance — Imperial
Crated Uncrated
Component
name
Crate size
(Dollies not attached)
(") (Height × Width ×
Depth/Length)
Weight (lb)
Minimal dimensions (")
*
Weight (lb)
Door
width
Corridor /
elevator
width
Corridor /
elevator
length
Width of
corridors with
90° turns
†
Height
CT PDU 48.4×35.4×27.6
D670/BSE 970
D670/OPT 1015
39.4 39.4 39.4 39.4 any
D670/BSE 772
D670/OPT 815
CT UPS
32.2×12×32 any any any any any 352
CT console (NIO)
25.6×18.5×32.6 253.5 any any any any any 194
CT accessories
45.3×39.4×59 110 39.4 43.3 59 70.8 any 110
CT sub-system
covers
75×39.4×67 1183 31.5 31.5 39.4 50.4 78.3 66
NM/CT covers 81.5×41.3×77.6 198 any any any any any 55
MDP
‡
**
38.5×28×18 120 any any any any any 99
Optional Items
Contrast Injector May vary but not
more than
31.5×31.5×31.5
May vary but not
more than 33 any any any any any <28.6
AW W/S
* The minimum door width required in order to bring the system components into the scan room also depends on the width of the corridor leading
to the room. When planning or measuring the width of the scan room door, use the graphs provided in Figure 1-2: D670 Relative Required Width
for Corridor and Scan Room Door, p.1-17 in order to verify that the measurements comply with the requirements.
† The corridor width required in order to move the system components from the unloading area to the scan room depends on the angles of turns on
the corridor. See Figure 1-3: D670 Required Corridor Width for 90° Turns, p.1-18 for the required width when the angle is 90
°.
‡ A1 or other; if ordered from GE, delivered in advance as part of the site preparation and must be installed prior to system installation
** In some cases, an alternative MDP is supplied, in order to comply with local electricity standards, see Power Input Distribution Box (PIDB) with
MDP (A1), p.5-14