Electrical Requirements 5.5 System Cable Information
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare 5-12
5.5 System Cable Information
This section provides technical information regarding system cables connecting different
subsystems, in order to facilitate the planning of cable routing.
Table 5-5: D670 Sub-system Inter-connection Cables
Start / Destination
H/V
Separation
(Y or N)
Run
#
Actual Length
(Usable Length)
*
Description
From To
Feet Meters
PDU CT gantry Y 050 63 (55) 19.3 (16.76) HVDC, PDU to gantry
PDU CT gantry Y 051 62.5 (55) 19 (16.76) HVAC, PDU to gantry
PDU CT gantry Y 052 63 (57) 19.3 (17.56) LVAC, PDU to gantry
PDU
Console
(adaptor box)
Y 053 80 (75) 24.5 (22.86) LVAC, PDU to console
PDU CT gantry N 055 63 (55) 19.3 (16.76) Ground, PDU to raceway
Console CT gantry N 056 83 (75) 25.5 (22.86) Ground, raceway to console
PDU CT gantry N 100 70(62) 21.4 (18.86) Signal, gantry MSUB to PDU
Console CT gantry N 101 86(78) 26.35 (23.71) Signal, gantry MSUB to OC
Console CT gantry N 102 86 (81) 26.3 (24.86) Signal (LAN), gantry to OC
Console CT gantry N 103 80 (75) 24.3 (22.86) Fiber optic, gantry to OC
PDU UPS Y 15 (12) 4.6 (3.6) Power cable, CT PDU to UPS
PDU UPS Y 15 (12) 4.6 (3.6) Power cable, UPS disconnect panel to CT PDU
UPS
MDP (A1)
†
Y 45 (37) 13.6 (11.3) UPS control cable
Injector CT gantry N 100 30.5 Gantry to injector