Equipment Description and General Construction Requirements 2.2 Room Size, Layout and Considerations
2.2.2 System Layout Drawings
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare 2-20
Figure 2-13:Typical Square Layout
Enables installation, operation
and service of the system in safe
conditions
Enables relative freedom of
movement for operator and
service, with operator access on
both sides of the system
Includes three collimator carts
Console in operator room is
positioned to the side; site must
provide means such as closed
circuit camera or mirrors to allow
the operator to see into the bore.
EMO