EasyManua.ls Logo

GE Innova 3100 - Page 182

GE Innova 3100
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power supply and ground cables provided by the customer shall be compliant with local
regulations (UL, CSA, IEC, CCC).
Power supply and ground cables must be CCC certified and labeled for installation in China.
Reference: For specific Vascular system grounding maps and connection details, refer to the
MisMap and mis chart listed in Section 15, MIS (Master Interconnect System).
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
182 4 Power and Grounding Requirements

Table of Contents

Related product manuals