Installation safety instructions:
•
Contractor responsibility:
○
Electrical contractor is responsible for providing and connecting the cables
and configuring the PDB in by-pass mode.
○
GEHC is responsible for powering on the system with the UPS in by-pass
mode.
○
GEDE is responsible for UPS comissioning.
•
After removing the sidewalls of the UPS, make sure that all earth connections
when reassembling, are correctly reattached.
•
This UPS is intended for use in a controlled indoor environment free of
conductive contaminants and protected against animals intrusion.
•
HIGH GROUND LEAKAGE CURRENT: Ground connection is essential before
connecting to AC input!
For Europe only, if a differential breaker is placed on the hospital main supply,
upstream the PDB, the differential shall be set to 300 mA.
•
Switching OFF the unit does not isolate the UPS from the utility.
•
Do not install the UPS in an excessively humid environment or near water.
•
Avoid spilling liquids on or dropping any foreign object into the UPS.
•
The unit must be placed in a sufficiently ventilated area; the ambient
temperature should not exceed 104°F (40°C).
•
Optimal battery life time is obtained if the ambient temperature does not exceed
77°F (25°C).
•
It is important that air can move freely around and through the unit. Do not block
the air vents.
•
Avoid locations in direct sunlight or near heat sources.
•
Check local regulations for UPS installation.
Storage safety instructions:
•
Store the UPS in a dry location; storage temperature must be within –13°F (–
25°C) to 131°F (55°C).
•
If the unit is stored for a period exceeding 3 months, the battery must be
recharged periodically (time depending on storage temperature).
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
34 1 Description of Innova System