GE Analytical Instruments ©2010 149 of 226 DLM 74001-04 Rev. A
Chapter 7: Maintenance
11. Reconnect the 1/4" Teflon tubing from the sampling port adapter to the inlet of the in-line filter. The in-
line filter has arrows on the body of the filter that indicate the direction of flow through the filter.
Tighten the nut one-quarter turn past finger-tight.
12. Reconnect the 1/4" Teflon tubing to the outlet of the filter and tighten the nut one-quarter turn past
finger-tight.
13. Turn on the water supply at the sampling port.
14. Turn on the Analyzer using the main power switch.
Figure 38: Replacing the In-Line Filter Element
Setting the Installation or Date for New Consumables
When you replace a consumable, you must enter the date of installation ensure that the Analyzer keeps an
accurate record of usage and that the indicators on the Main screen remain accurate.
1. Press the Menu button and select the Maintenance tab.
2. Press the Consumables button.
3. Press the New... button that corresponds to the consumable you are installing. Choose New Lamp,
New Tube, or New RBed, press the Accept button to enter today’s date, or enter values for the
appropriate Day, Month and Year and then press the Accept button.
4. Repeat Step 3 for each consumable that you installed.
Note:
When Password protection or DataGuard is activated, not all users are able to modify
settings on this screen. See “Menu Map — DataGuard (Optional Upgrade)” on page 103 or
“Using DataGuard” on page 105 for more information.
60
M
Closed
End
Spring
Place wrenches
here
Loosen
inlet
adapter
60
M