Magnet positioning line
1. Magnet positioning line and Dock Frame anchor position is defined from iso center.
2. Illustration 3-9 shows Magnet positioning line that will be used for Magnet alignment.
Drawing of line is required before Magnet Installation under the PMI’s responsibility.
Illustration 3-9: Magnet positioning line and Dock Frame anchor position Detail
NOTE: All dimensions are in inches; bracketed dimensions are in millimeters
SIGNA Voyager Pre-Installation
Direction 5680008–1EN, Revision 2
78 6 Finished Room Requirements