EasyManua.ls Logo

GE Versana Balance - 3-2 Setup reminders

GE Versana Balance
431 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup reminders
Versana Balance – Basic Service Manual System view 3-3
5808768-100 English Rev.9
3-2 Setup reminders
3-2-1 Average setup time
Unpacking the Versana Balance: 30 minutes
Set up Versana Balance options: 30 minutes
DICOM Network Configuration: 30 minutes or more,
depending on the configuration
Install Insite: 0.5 hour
The Versana Balance installation and functional checkout will
take approximately 1 hour. Versana Balance consoles with
optional equipment may take slightly longer.
3-2-2 Setup warnings
DANGER
WHEN USING ANY TEST INSTRUMENT THAT IS CAPABLE
OF OPENING THE AC GROUND LINE (I.E., METER’S
GROUND SWITCH IS OPEN), DON’T TOUCH THE
ULTRASOUND SYSTEM!
CAUTION
To prevent electrical shock, connect the unit to a properly
grounded power outlet. DO NOT use a three to two prong
adapter. This defeats safety grounding.
CAUTION
DO NOT wear the ESD wrist strap when you work on live
circuits and more than 30 V peak is present.
CAUTION
DO NOT operate this unit unless all board covers and frame
panels are securely in place. System performance and cooling
require this.

Table of Contents

Related product manuals