Completed probe sheath
installation
When the primary and secondary seals are in place and properly tightened, the probe
sheath assembly stays in the compressed condition against the internal pressure in the
disposable bag without the need of external fixtures. No additional measures are needed
to prevent the probe from sliding out of the disposable bag.
Install the temperature probe
Follow the instructions below to install the temperature probe into the disposable bag.
ActionStep
Slowly and carefully remove the zip tie from the thermowell.1
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD 179
6 Preparation
6.4 Prepare and install the probes
6.4.4 Insert probes into the disposable bag

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Xcellerex XDM Series and is the answer not in the manual?

GE Xcellerex XDM Series Specifications

General IconGeneral
BrandGE
ModelXcellerex XDM Series
CategoryMixer
LanguageEnglish

Related product manuals