EasyManua.ls Logo

GE Xcellerex XDM Series - Page 179

GE Xcellerex XDM Series
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Completed probe sheath
installation
When the primary and secondary seals are in place and properly tightened, the probe
sheath assembly stays in the compressed condition against the internal pressure in the
disposable bag without the need of external fixtures. No additional measures are needed
to prevent the probe from sliding out of the disposable bag.
Install the temperature probe
Follow the instructions below to install the temperature probe into the disposable bag.
ActionStep
Slowly and carefully remove the zip tie from the thermowell.1
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD 179
6 Preparation
6.4 Prepare and install the probes
6.4.4 Insert probes into the disposable bag

Table of Contents

Related product manuals