0020112600_02-10/12-Glow-worm
- 10 -
INSTALLATION
Theapplianceisdeliveredinasinglecartonwithadocument
packandttings.
i
The ues package will be ordered according to the
conguration of the installation.
• Pleasecheckthecontents.
2.4
2.3
2.2
2.1
2
3
4
4.1
4.2
4.3
4.4
4.5
4.64.7
1
1
2
3
4
5
6
General
Thisboilerisdesignedtoprovidecentralheatingfromasealed
watersystemwithafullyindirectcylinder.Thepump,expansion
vesselandassociatedsafetydevicesareallttedwithinthe
boiler.
Safety valve
Thesafetyvalveisanintegralpartoftheboileranditcannot
beadjusted.Thepipefromthesafetydischargevalvemust
dischargesafelyinaccordancewithstandards.
Expansion vessel
Theboilerhasanintegralexpansionvesselwithacapacityof8
litres(1.76gallons),withachargepressureof0.75bar.
i
The heating system volume should be calculated to
ensure that the expansion vessel is suitable, it may
be necessary to add an additional vessel.
- InGB,Guidanceonvesselsizingisalsogiveninthecurrent
issueofBS5449andBS7074Part1.
- InIE,currenteditionofI.S.813“DomesticGasInstallations”.