INSTALLATION
• Makesurethattheequipmentusedforimplementingthe
installationiscompatiblewiththatoftheappliance.
• Determinetheassemblylocation.Seethe"Appliance
location"chapter.
735
709
63
156
160
160
Ø105*
Ø125*
Ø130**
Ø150**
=246=
170
65
65
58
58
• Takethewalltemplateandplaceinthedesiredposition
onthewall,givingdueconsiderationtotherequiredboiler
clearances,seechapter"Appliancelocation►Clearances",
andtheueyouaretting.
130
90°
6
5
4
1
2
3
Flue hole cutting
• Markthepositionoftheuecentre.
• Removethewalltemplate,thendrilltheuehole.
i
The ue is designed with an internal fall of 44mm/
metre (2.5º), therefore the hole can be drilled
horizontally.
• Usea105mmdiametercoredrillforexternalaccessue
installation(60/100ue)(80/125ue►Ø130mm).
• Usea125mmdiametercoredrillforinternalaccessonlyue
installation(60/100ue)(80/125ue►Ø150mm).
i
If ue extension pipes are to be used then a core
drill size of 125mm is required. This will allow the
extension pieces to slope at 44mm/metre (2.5º)
towards the boiler.
• Ifttingasideue,extendtheuecentrelineintothecorner
then130mmalongtheadjacentwall.
• Ifttinganextendedsideue,determinetheueholecentre
byextendingthedashedinclinedlineonthetemplatetothe
sidewall.Thisdashedlineisdrawnat44mm/metre(2.5º)
risefromtheboiler.Wherethislinereachesthesidewall,a
horizontallineshouldbemarked.Theverticalcentrelineof
theueshouldthenbemarkedat130mmfromthebackwall.
Toallowfortheuepassingthroughthewallatthisangle
a125mmholeshouldbedrilledirrespectiveofinternalor
externalinstallation.
Hanging bracket xing
Duetothevariedsiteconditions,xingsarenotsuppliedand
advisethattheinstallershouldsupplythosewhicharesuitable.
• Drilltheholesforthexingscrewsinaccordancewiththe
walltemplate.
• Fixthehangingbracketonthewall.