Spraying
Purge Purge
Purge
Air Air
Air
Procedure Procedure
Procedure
NOTE: NOTE:
NOTE:
Performthisprocedureanytimeairis
introducedintothesystem.
1.Relievepressure.See
PressureReliefProcedure,page62.
2.Installarecirculationkitorinstallbleedlines
betweentheoutletmanifoldrecirculation
ttingandawastecontainer.
NOTICE NOTICE
NOTICE
Topreventequipmentdamage,donot
circulateuidcontainingablowingagent
withoutconsultingwithyourmaterial
supplierregardinguidtemperature
limits.
3.Presstheproportionerstopbuttonto
turnoffthemotor.
4.Torelieveairpressurefromthefeedpumps,
disconnecttheairsupplylines(G)fromthe
feedpumps(K).
5.SetthePRESSURERELIEF/SPRAYvalves(SA,
SB)toPRESSURERELIEF/CIRCULATION
.
6.Adjustthepressureinthefeedpumpair
supplylinesto100psi.
7.Topressurizethefeedpumps,connectthe
airsupplylines(G)tothefeedpumps(K).
8.PresstheJogmodebuttontoenterJog
mode.Usethearrowkeys
tosetthe
jogspeedtoJ20.
9.Pressthejogmodestartbutton
tostart
themotor.Run1gallon(3.8L)ofmaterial
throughthesystem.
10.SetthePRESSURERELIEF/SPRAYvalves(SA,
SB)toSPRAY
.
11.Torelieveairpressurefromthefeedpumps,
disconnecttheairsupplylines(G)fromthe
feedpumps(K).
12.Pressthejogmodestopbuttontoexit
Jogmode.
60 333023U