GDM-8245 Service Manual
50
Preparation
Servicing should only be performed by a qualified
technician. Before performing calibration, read the
Safety
Requirements
and
Precautions Before Use
section. Failure
to do so may damage the instrument or result in injury or
death.
In order to ensure performance accuracy, we recommend
that all the following items be performed in the order
recommended in this manual.
Calibration and
verification items
Operating Voltage-
Verification
LED brightness-
Verification
Power Supply-
Verification
ACV Frequency
Response- Verification &
Adjustment
Resistance Range
Verification- Calibration
Diode- Adjustment
Capacitance- Adjustment
DCA- Adjustment
ACA- Adjustment
DCV- Adjustment
Resistance Ranges
Shorting- Verification
Resistance Range-
Verification
Diode- Verification
Capacitance Short-
Verification
Capacitance- Verification
DCA Short- Verification
DCA- Verification
ACA- Verification
ACV- Short Verification
ACV- Verification
AC+DC- Verification
DCV Short- Verification
DCV- Verification
DCV- Verification (dB)
Buzzer Test
Frequency- Verification
(AC+Hz)
When to Run
Calibration and
Verification
When using the instrument in a new environment
After replacing one of the major internal modules,
such as the front panel or instrument PCB
To check whether the instrument is malfunctioning
or not