90 6LE008146B
Measurement functions
6.7 Measuring averaged values over an interval
Synchro
t
t
Synchronised integration interval
The duration of interval T can be configured at between 1 and 60 minutes in increments of
1 minute.
Synchronised integration interval
When the first synchronisation pulse is received, a first averaged value calculation is initialised.
For each new pulse, the integration in progress is stopped and the averaged value available is
updated. At the same time, a new calculation is initialised.
The time interval between two synchronisation pulses must be between 1 and 60 minutes. If
the interval exceeds 60 minutes, integration of the measurement stops and the measurements
up to the next synchronisation pulse are not taken into account.