4
Installation GREYHOUND Switch
Release
01
04/2016
2.3 Mounting the cover panel and the power supply unit
(optional) 40
2.3.1 Mounting the cover panel 40
2.3.2 Mounting the power supply unit 40
2.4 Mounting a media module (optional) 41
2.5 Installing and grounding the device 42
2.6 Connecting the terminal blocks 46
2.6.1 Supply voltage 46
2.6.2 Signal contact 49
2.7 Installing an SFP transceiver (optional) 50
2.8 Operating the device 51
2.9 Connecting data cables 51
2.10 Filling out the inscription label 51
3 Making basic settings 52
4 Monitoring the ambient air temperature 53
5 Maintenance and service 54
6Disassembly 55
6.1 Removing a power supply unit 55
6.2 Removing a media module 56
6.3 Removing an SFP transceiver 56
6.4 Removing the device 57
7 Technical data 58
7.1 General technical data 58
7.1.1 Basic device 58
7.1.2 Power supply units 59
7.1.3 Media modules 61
7.2 Dimension drawings 62
7.2.1 Basic device 62
7.2.2 Power supply units 63
7.2.3 Media modules 64
A Further Support 75