EasyManua.ls Logo

HP Jet Fusion 5200 Series - Calibration Process

HP Jet Fusion 5200 Series
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Attach the new sheet metal parts and the U-shaped tube with the two screws that you just
removed. Do not tighten the screws until the calibration process has finished.
Calibration process
Position the forklift in front of the processing station and check how it aligns with the processing-station
guide on the righ
t.
Horizontal adjustment (if needed)
Move the U-shaped tube to left or right until the forklift foot is aligned with the processing-station guide.
Calibration process 81

Table of Contents

Related product manuals