EasyManua.ls Logo

HP Jet Fusion 5200 Series - Build-Unit Maintenance; Summary of Maintenance Operations

HP Jet Fusion 5200 Series
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10. Close the lid and lock it with the latches.
NOTE: Check that the external-tank collector is connected to the storage-tank cover.
11. The front panel displays the status as ready.
CAUTION: Use HP-certified external tanks only. The use of third-party external tanks can cause safety
risk
s, material leakages, and malfunctions in the processing station; and may affect your system
warranty.
Build-unit maintenance
Summary of maintenance operations
This topic provides a full set of reference information for this subject.
Table 11-26 Summary of maintenance operations
Frequency Maintenance operation
Once per build, after unpacking Clean the surface of the build unit on page 307
Once a week Clean the exterior of the build unit on page 316
Once a month Clean the bottom area of the Build Unit on page 316
Clean the column gasket on page 320
Once a year Replace the build-unit material-chamber filters on page 318
Before changing the mix ratio Clean the surface of the build unit on page 307
306 Chapter 11 Hardware maintenance

Table of Contents

Related product manuals