3.2.4 Electrical grounding requirements
3.3 Rack warnings and cautions
3.4 Server warnings and cautions
3.5 Electrostatic discharge
3.6 POST screen options
4 Hardware options installation
4.1 Hardware option installation guidelines
4.2 Tower to rack conversion kit
4.2.1 Installing the tower-to-rack conversion kit
4.2.2 Preparing the server for rack installation
4.2.3 Installing the rack rails and server tray
4.2.4 Installing the server on the tray
4.3 Installing the PCI fan and air baffle options
4.4 Power supply options
4.4.1 Hot-plug power supply calculations
4.4.2 Power supply warnings and cautions
4.4.3 Flexible Slot (Redundant) power supply enablement option
4.4.3.1 Installing a Flexible Slot (Redundant) power supply enablement option
4.5 Drive options
4.5.1 Drive installation guidelines
4.5.2 Drive support information
4.5.3 Installing an LFF non-hot-plug drive in the drive cage
4.5.4 Installing an LFF hot-plug drive
4.5.5 Installing an SFF hot-plug drive
4.6 Media device options
4.6.1 Installing a SAS LTO tape drive
4.6.2 Installing a USB RDX drive
4.6.3 Installing an optical drive
4.6.4 Installing an LFF non-hot-plug drive in the media drive bay
4.7 Memory options
4.7.1 DIMM population information
4.7.2 Installing a DIMM
4.8 M.2 SSD/dedicated iLO/serial port enablement option
4.8.1 M.2 SSD/dedicated iLO/serial port enablement option components
4.8.2 Installing the M.2 SSD/dedicated iLO/serial port enablement board
4.8.3 Installing the serial port cable
4.8.4 Enabling the dedicated iLO management module
4.9 M.2 SSD option
4.9.1 Installing an M.2 NVMe SSD on the system board
4.9.2 Installing an M.2 NVMe SSD on an M.2 SSD/dedicated iLO/serial port enablement board
4.10 Storage controller options
4.10.1 Installing a Smart Array standup storage controller
4.11 Energy pack options
4.11.1 HPE Smart Storage Battery