EasyManua.ls Logo

HPE ProLiant DL325 Gen10 - Server Power Management

HPE ProLiant DL325 Gen10
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Install the Kensington security lock.
Powering up the server
Procedure
1.
Remove the bezel.
2.
Use one of the following methods to power up the server:
Press the Power On/Standby button.
Use the virtual power button through iLO.
3.
Install the bezel.
Powering down the server
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to the system.
Prerequisites
Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical server data
and programs.
Procedure
1.
Remove the bezel.
2. To power down the server, use one of the following methods.
Press and release the Power On/Standby button.
Operations 27

Table of Contents

Related product manuals