EasyManua.ls Logo

HPE ProLiant DL325 Gen10 - Page 90

HPE ProLiant DL325 Gen10
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
1. Power down the server.
2. Access the product rear panel.
3. Release the power cord from the strain relief clip.
4.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
5.
Remove the server from the rack.
6.
Place the server on a sturdy, level surface.
7.
Remove the access panel.
8.
Remove the left rail.
a.
Pull the latch on the inner rail.
b.
Detach the inner rail from the server.
9. Remove the non-redundant power supply.
90 Hardware options installation

Table of Contents

Related product manuals