EasyManua.ls Logo

HPE ProLiant DL325 Gen10 - Page 92

HPE ProLiant DL325 Gen10
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12. Cable the RPS.
13. Install a hot-plug power supply in power supply bay 1.
For the power supply bay locations, see
Rear panel components.
14.
To enable power redundancy in the server, install a second power supply in power supply bay 2:
a.
Remove the power supply blank.
92 Hardware options installation

Table of Contents

Related product manuals