ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
4. Remove the access panel .
5. Remove the riser cage.
To remove the primary riser cage: