CAUTION:
Be sure to tighten each heatsink nut fully in the order indicated. Otherwise, boot failure or
intermittent shutdowns might occur.
c. Using a T-30 Torx screwdriver, fully tighten each heatsink nuts in the order indicated on the heatsink
label (1 -2 -3 -4) until it no longer turns.
11. Install the processor mezzanine tray (Installing a processor mezzanine tray on page 102).
12. Install the air baffle (Installing the air baffle on page 41).
Installing hardware options 101