EasyManua.ls Logo

Huawei S2700 - Page 134

Huawei S2700
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 13-44 Installing two terminals back to back
NOTICE
Ensure that the OT terminal is not in contact with other terminals or metal
components.
c. Move the cable slightly and ensure that it is securely connected, as shown in Figure
13-45.
Figure 13-45 Installed OT terminal
l Install two OT terminals on a post.
Before you install two OT terminals on a post, ensure that the two terminals can be
installed on the post and that the electrical connecting pieces have a large contact area.
Two OT terminals can be installed using any of these methods:
Bend the upper OT terminal at a 45- or 90-degree angle, as shown in Figure 13-46.
Cross the two terminals, as shown in Figure 13-47.
S2700&S3700&S5700&S6700 Switch
Hardware Installation and Maintenance Guide
13 Appendix
Issue 13 (2017-11-20) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
126

Table of Contents

Related product manuals