6.2.1.1 Installing Cables
6.2.1.1.1 Installing Cables
Context
This section describes operations on a single 15 kVA/20 kVA UPS.
Procedure
Step 1 Connect the power cables to the corresponding ports on the UPS.
Figure 6-1 Three-phase input, three-phase output, one power source (factory
settings)
UPS2000-G-(6 kVA–20 kVA)
User Manual (Lead-Acid Battery) 6 Operations
Issue 23 (2024-03-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 114