Reserve a clearance of at least 500 mm respectively from the front and rear panels
of the UPS to the wall or adjacent equipment to facilitate ventilation and heat
dissipation, as shown in Figure 4-5.
Figure 4-5 Reserved clearances
4.1.2 Tools
The onsite operation personnel can select tools based on the site requirements.
Personal protective equipment
Safety helmet Goggles Protective shoes Reective vest
ESD gloves Insulated gloves Protective gloves
-
UPS2000-G-(6 kVA–20 kVA)
User Manual (Lead-Acid Battery) 4 Installation