EasyManua.ls Logo

IBM 9080-M9S

IBM 9080-M9S
730 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 10. Connecting the rear power cords
Preparing the system for operation after removing and replacing a line cord conduit from
the 9080-M9S system node
To prepare the system for operation after removing and replacing a line cord conduit, complete the steps
in this procedure.
Procedure
If the customer required the system to be powered off to complete the repair, have the customer perform
the following steps. If the customer did not require the system to be powered off, no additional steps are
necessary.
a) To power on the system, from the Operation list, select System Level Activate. Then, click OK to
conrm the operation.
b) To restart the logical partitions, complete the following steps:
1) In the navigation area, click the Resources icon
, and then click All Systems.
2) Click the system name in which you want to activate the logical partition.
3) Select the logical partition name that you want to activate.
Cables
11

Table of Contents

Related product manuals