EasyManua.ls Logo

IBM 9080-M9S

IBM 9080-M9S
730 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 253. Removing the UPIC cable from the system node
e) If needed to allow for more slack in the SMP cables, label and unclip the SMP cable bundle from the
side of the cable management bracket as shown in the following gure, and move the SMP cables
to near the center of the system node.
296
Power Systems: Removing and replacing parts in the 9080-M9S system

Table of Contents

Related product manuals