EasyManua.ls Logo

IBM 9080-M9S

IBM 9080-M9S
730 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 472. Replacing the front screws
4. Review the following information to identify the locations where each SMP cable connects to the
system node that you are servicing. Then, refer to your labels and the following steps to reconnect
the SMP cables that you removed from the system node you are servicing.
If you have a two node system conguration, use Figure 473 on page 542 and Table 55 on page
542 to determine the point-to-point cabling for SMP cables.
Processor VRM
541

Table of Contents

Related product manuals