EasyManuals Logo

IBM Flex System p260 User Manual

IBM Flex System p260
524 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #277 background imageLoading...
Page #277 background image
CA0000A0
Explanation: Open firmware package corrupted (phase 2)
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00D001
Explanation: PCI probe process completed, create PCI bridge interrupt routing properties
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00D002
Explanation: PCI adapter NVRAM hint created; system is rebooting
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00D003
Explanation: PCI probing complete
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00D004
Explanation: Beginning of install-console, loading GUI package
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00D008
Explanation: Initialize console and flush queues
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA0000A0 • CA00D008
Chapter 8. Troubleshooting 265

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Flex System p260 and is the answer not in the manual?

IBM Flex System p260 Specifications

General IconGeneral
BrandIBM
ModelFlex System p260
CategoryServer
LanguageEnglish

Related product manuals