EasyManua.ls Logo

IBM Flex System p260 - Page 299

IBM Flex System p260
524 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CA00E890
Explanation: Starting to initialize open firmware
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00E891
Explanation: Finished initializing open firmware
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00EAA1
Explanation: Probe PCI-PCI bridge bus
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA060203
Explanation: An alias was modified or created
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA26FFFF
Explanation: An extended item was required for lpevent to complete.
Response:
1. Go to Checkout procedure.
2. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA26TTSS
Explanation: Waiting for lpevent of type tt and subtype ss.
Response:
1. Reboot the server.
2. If the problem persists:
a. Go to Checkout procedure.
b. Replace the system-board, as described in Replacing the system-board and chassis assembly.
CA00E890 CA26TTSS
Chapter 8. Troubleshooting 287

Table of Contents

Related product manuals