EasyManuals Logo

IMT 1015 User Manual

IMT 1015
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
99903514: TELESCOPIC CRANE: 1-14 SECTION 1: OPERATION
1-10: CHANGING FROM DOUBLE TO
SINGLE-PART LINE
Initially, your crane is set up with two-part line.
Single-part line gives you a closer load distance
and faster line speed.
If you require a closer load distance or a faster
line speed, first check that you have the capac-
ity to lift your load using single part line. If you
do, change the crane to one part line using the
following steps:
1) Disconnect the pin which holds the hook/
snatch block assembly in place. Set aside the
pin and the snatch block.
2) Disconnect the double-line anchor pin.
3) Remove the downhaul weight from the crane
boom tip.
4) Slide the downhaul weight onto the wire rope.
Drop it into place on the hook. NOTE: Some
cranes have two hooks. Use the hook rated for
your load.
5) Lift your load. When finished, return the
boom tip to two-part line, or stow the snatch
block and pin.
Figure A-17: Single/Two-Part Line
Diagram - Low Profile Boom Tip
B. Two-Part Line Configuration
Downhaul
weight
Snatch
block
Two-part line load
support pin
Downhaul
weight - installed
with single-part
line
Two-part line
anchor pin
A. Single-Part Line Configuration
Figure A-18: Single/Two-Part Line
Diagram - Traditional Boom Tip
20030115

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IMT 1015 and is the answer not in the manual?

IMT 1015 Specifications

General IconGeneral
BrandIMT
Model1015
CategoryConstruction Equipment
LanguageEnglish

Related product manuals