EasyManua.ls Logo

Inovance MD520 Series - Communication Configurations with Controllers

Inovance MD520 Series
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical Installation (T13 Models)
116
3. Place the cabinet and tighten the M12 screw. The screw part of the expansion screw
will be pulled upward, so that the spring enclosure will be deformed outward for
fixing, as shown by "Step 3" in the following figure.
Figure 6‑2 Installing an expansion screw
6.5 Requirements on Foundation
Separate high‑voltage cables from low‑voltage cables by placing them on different
brackets. For failures to do so due to any restrictions, place the low‑voltage cables
in completely enclosed metal pipes.
The cable trench must be: a) made of incombustible materials; b) smooth,
moisture‑proof, and dust‑proof; and c) able to prevent intrusion of animals.
During foundation design, take the following factors into consideration: sufficient
space in front of the cabinet for inspection, and wiring and cabling of power
supply cables, actuating motor cables, and system control cables. The cabinet
comes with a cable trench or cable guide. Separate power cables from signal
cables. Failure to comply will affect the operation of the AC drive. The following
figure shows the routing and related requirements.

Table of Contents

Other manuals for Inovance MD520 Series

Related product manuals