Mechanical Installation (T1 to T9 Models)
80
4 Mechanical Installation (T1 to T9 Models)
4.1 Installation Method
T1 to T9 models support backplate mounting and through‑hole mounting.
4.2 Cabinet Design
4.2.1 Overview
Before installing the AC drive in the cabinet, design the cabinet to ensure sufficient
clearances for installation and heat dissipation. Take the following factors into
consideration:
Cabinet clearances
Mounting backplate
Cabinet heat dissipation
4.2.2 Cabinet Clearance Requirement
For T1 to T9 models, multi‑layer installation is recommended. That is, install one AC
drive above another. The following table lists the minimum clearance between the
upper and lower AC drives. Install an air guide plate above each AC drive except the
top one.
Table 4–1 Minimum clearance (mm) for multi‑layer installation
Item T1 to T4 T5 T6 T7 to T9
S1
100 200 200 300
S2
100 200 200 300
...
100 200 200 300
Sn
100 200 200 300