7418 East Helm Drive • Scosdale, Arizona 85260 • 480.948.5555 • www.interfaceforce.com
Page 17 of 45
CAUTION
Ensure all threaded connecons are engaged at least one (1) diameter length of the threads.
CAUTION
Threaded connecons that boom out must be backed o one full turn to avoid binding.
11. Turn on the pump and carefully guide the last threaded connecon between the adapters. As the threads
make inial contact, the slack adapter will raise the LVDT and stop when it is in the center of travel.
Never posion any bodily part between threaded connecon adaptors.
12. Carefully begin to make the nal thread connecon. As the threads are engaged, the piston will follow
the engagement to keep the LVDT centered. Stop when at least 1 diameter of threads are engaged on all
threaded connecons.
13. Turn on the pump and carefully guide the last threaded connecon between the adapters.
As the threads make inial contact, the slack adapter will raise the LVDT and stop when it is
in the center of travel.
14. Carefully begin to make the nal thread connecon. As the threads are engaged, the piston
will follow the engagement to keep the LVDT centered. Stop when at least 1 diameter of
threads are engaged on all threaded connecons. Threaded connecons that boom out
must be backed o one full turn to avoid binding.
15. Through the front access door, check the oil level in the sight glass (See gure 10).
16. Check the oor of the Calibraon Rig for indicaons of oil leaks, if no leaks are visible, close
the front access door.