CHV180 series frequency inverter special for elevator                                      Maintenance 
.97. 
9. Maintenance 
 
● Maintenance must be performed according to designated maintenance methods. 
● Only qualified technicians are allowed to carry out the maintenance. 
●  Disconnect  the  power  supply  before  maintenance.  Wait  for  10  minutes  before 
maintenance. 
● Do not touch the components or devices on PCB board directly. Otherwise inverter 
may be damaged by electrostatic. 
● Check to ensure the tightness of the screws after the maintenance. 
 
9.1 Daily maintenance 
Daily maintenance should be performed for the avoidance of the fault and insurance of 
the  normal  operation  and  long  usage.  See  the  following  table  for  the  detailed 
maintenance:   
Items  Instructions 
Temperature/Humility
Check  to  ensure  the  ambient  temperature  is  among 
0℃~50℃ and the humility is among 20~90%. 
Oil fog and dust   
Check to ensure there is no oil fog, dust and condensation in 
the inverter.   
The inverter   
Check to ensure that there is abnormal heating and vibration 
in the inverter.   
The fan 
Check  to  ensure  the  fan  works  normally  and  there  is  no 
foreign objection in the inverter.   
Input power supply 
Check  to  ensure  the  voltage  and  frequency  of  the  input 
power supply is in the allowed range.   
The motor 
Check  to  ensure  there  is  no  abnormal  vibration,  heating, 
noise and phase loss on the motor.   
 
9.2 Periodic maintenance 
The user has to check the inverter periodically (within half year) for the avoidance of fault 
and  stable  and  longterm  high-performance  running.  See  the  following  table  for  the 
detailed check: