13
Final assembly
Step 1:
Press the [Open furnace head] button and wait until the furnace head has reached the upper final position.
Step 3:
Place the object tray (13) on the object tray rest (14) in the firing
chamber
Step 2:
Remove the transport safety film.
Please check the surfaces for adhesive residue. Any
adhesive residue must be removed.
Step 4:
Close the furnace head using the [Close furnace head] button. The furnace is now ready for use.
13
14
Before the first firing, the firing chamber must be dehumidified using program 7 (sintering of
IPS e.max ZirCAD MT Multi).
The furnace should be regularly switched off and on again so that the automated tests can be performed during
the self-test.
Press the [Continue] button to acknowledge the self-test.
2. Application