C 3
1298.GB
4 Commissioning
m
The truck must only be operated on battery current. Rectified alternate current will da-
mage the electronics. Cables connected to the battery (towing cable) must be less
than 6 meters in length.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
If necessary, install and charge the battery (see chapter D, sections 4 and 5).
Commission the truck as detailed in chapter E, section 3.
m
Please check if the tilting protection (1) is
existing before commissioning the
trucks.
All safety devices must be checked on
their availability and function.
1
1
C 3
1298.GB
4 Commissioning
m
The truck must only be operated on battery current. Rectified alternate current will da-
mage the electronics. Cables connected to the battery (towing cable) must be less
than 6 meters in length.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
If necessary, install and charge the battery (see chapter D, sections 4 and 5).
Commission the truck as detailed in chapter E, section 3.
m
Please check if the tilting protection (1) is
existing before commissioning the
trucks.
All safety devices must be checked on
their availability and function.
1
1